Fully Pre-Installed Steam Boiler Plant
Manufactured with all the associated ancillary items required to complete a full steam boiler plant system. The CERTUSS Skid Mounted Package Plant Module (CVE) is compact, lightweight, and easy to manoeuvre into position. With all components pre-piped, pre-wired, interconnected
to the Generators. Finally a factory test is carried out prior to the equipment being dispatched to your site. With the equipment in position at your site, only site service connections are required before commissioning is carried out.
Main Features Include...
- Water Softener, Simplex or Duplex (optional)
- Dosing Equipment
- Stainless Steel Insulated feed water tank
- Feed water tank steam injection heating system
- Water Monitor facility (optional)
- Blow-down vessel, with cooling water facility
- Steam separator and trap set
- Pre-pressure pump system
- Control Panel Unit
Advantages
- Reduced site installation time and costs
- Simple maintenance access
- Compact size, therefore reducing site space requirements
- Lightweight, suitable for positioning on a mezzanine floor with the Steam Generators
- Central control panel for single site connection
- Galvanized and coated framework for durability
- Design and layout facility to suit site space available